Roy Martin Middle School
Click Here for Images Structure: 90' X 140' (12,600 sq ft)
Location: Las Vegas, NV
Challenge: Replace gymnasium at elementary school recently destroyed by a fire in time for school to start
Vision Building Systems Solution: A "turnkey" semi-permanent gymnasium completed within 60 days, including engineering and design work. The ability of our structure to be installed directly over an existing playground area provided a cost effective solution for the district. Our structure was designed for future relocation to another school site upon completion of the replacement permanent gymnasium.
Features: Met all building codes as a permanent structure Structure designed to support hanging loads for lighting, scoreboards, etc. Full HVAC system with ability to relocate with structure Unique ground anchor system alleviated the need for traditional concrete foundations
 |